| Work / Tender | Corr # | What changed | Issued | Value | |
|---|---|---|---|---|---|
| 1 | 2026_JSEB_113748_1 · nic | #1 nic | Other date/time? Due to typographical error in date and time in BOQ Tender Documents | 22 May 2026 | ₹17.47 Lakh |
| 2 | 2026_SSIP_1304127_1 · nic | #1 nic | Other date/time? EXTEND DATE | 22 May 2026 | ₹42.94 Lakh |
| 3 | 2026_UAD_504577_1 · nic | #1 nic | Other date/time? Amendment in the last date for purchsing tender from online | 22 May 2026 | under ₹1 Cr |
| 4 | 2026_PHED_507786_1 · nic | #1 nic | Other date/time? Updated Section 3 Conditions of Contract | 22 May 2026 | ₹42.56 Lakh |
| 5 | 2026_BRO_764443_1 · nic | #1 nic | Technical Bid date/time? Amendment No. 01 dated 22 May 2026 | 22 May 2026 | ₹22.07 Cr |
| 6 | 2026_BRO_764430_1 · nic | #1 nic | Technical Bid date/time? Amendment No. 01 dated 22 May 2026 | 22 May 2026 | ₹30.64 Cr |
| 7 | 2026_NRGOD_113988_1 · nic | #1 nic | Technical Bid Construction of Boundary wall, Drinking Water Facility Toilet and Poshan Vatika at PS DOMDIH G.P. TILABAD UNDER BLOCK SUNDERPAHARI in Godda District Group No. 14 | 22 May 2026 | ₹21.34 Lakh |
| 8 | 2026_SSIP_1303396_27 · nic | #1 nic | Other STAMP PAPER | 22 May 2026 | ₹28.44 Lakh |
| 9 | 2026_SSIP_1303396_30 · nic | #1 nic | Other STAMP PAPER | 22 May 2026 | ₹5.83 Lakh |
| 10 | 2026_SSIP_1303396_26 · nic | #1 nic | Other STAMP PAPER | 22 May 2026 | ₹33.90 Lakh |
| 11 | 2026_CIDCO_1304003_1 · nic | #1 nic | Other Reply to Queries | 22 May 2026 | ₹98.07 Lakh |
| 12 | 2026_CIDCO_1302031_1 · nic | #2 nic | Other Pre-Bid Meeting Notice | 22 May 2026 | ₹1,000 Cr+ |
| 13 | 2026_CIDCO_1300448_1 · nic | #1 nic | Other REPLY TO QUERIES | 22 May 2026 | ₹10 Cr+ |
| 14 | 2026_CIDCO_1300380_1 · nic | #1 nic | Other REPLY TO QUERIES | 22 May 2026 | ₹6.68 Cr |
| 15 | 2026_CMTDM_1304527_1 · nic | #1 nic | Technical Bid Security Deposit | 22 May 2026 | ₹1.41 Cr |
| 16 | 2026_MMRDA_1303410_1 · nic | #1 nic | Other Corrigendum 2 | 22 May 2026 | ₹1.52 Cr |
| 17 | 2026_UAD_495476_2 · nic | #1 nic | Other ward no. correction | 22 May 2026 | ₹5.96 Lakh |
| 18 | 2026_UAD_504615_1 · nic | #1 nic | Other Termsandcondition | 22 May 2026 | ₹1.50 Lakh |
| 19 | 2026_UAD_503970_1 · nic | #1 nic | Technical Bid ALL CONTRACTOR PROVIDE RATE ACCORDING TO ESTIMATE | 22 May 2026 | under ₹1 Cr |
| 20 | 2026_UAD_503905_1 · nic | #1 nic | Other corrigendum | 22 May 2026 | ₹55.27 Lakh |
| 21 | 2026_UAD_503906_1 · nic | #1 nic | Other corrigendum | 22 May 2026 | ₹55.27 Lakh |
| 22 | 2026_UAD_503904_1 · nic | #1 nic | Other corrigendum | 22 May 2026 | ₹46.88 Lakh |
| 23 | 2026_UAD_503907_1 · nic | #1 nic | Other corrigendum | 22 May 2026 | ₹55.27 Lakh |
| 24 | 2026_UAD_503903_1 · nic | #1 nic | Other corrigendum | 22 May 2026 | ₹46.88 Lakh |
| 25 | 2026_MPFD_507348_1 · nic | #1 nic | Other It is mandatory to bring a sample of the material to the pre-bid meeting. | 22 May 2026 | ₹1 Cr+ |
| 26 | 2026_MPFD_505463_1 · nic | #1 nic | Other Corrigendum for All in Computer, Laser Printer and Document Scanner of Additional Specification | 22 May 2026 | under ₹1 Cr |
| 27 | 2026_MoRTH_908360_1 · nic | #1 nic | Other Corrigendum01 | 22 May 2026 | ₹17.12 Cr |
| 28 | 2026_DREV_908594_1 · nic | #1 nic | Other Corrigendum on EMD | 22 May 2026 | ₹16.46 Cr |
| 29 | 2026_SAI_909191_1 · nic | #1 nic | Other Addendum | 22 May 2026 | ₹9.70 Lakh |
| 30 | 2026_DDA_908989_1 · nic | #1 nic | Other Corrigendum | 22 May 2026 | ₹73.89 Lakh |
| 31 | 2026_ASI_908189_1 · nic | #1 nic | Other Revised Description of S.No.2 in Schedule of Requirements is attached in Annexure-1 and the same may be read as description in BOQ. | 22 May 2026 | ₹72.85 Lakh |
| 32 | 2026_ASI_908182_1 · nic | #1 nic | Other Revised Description of S.No.1 in Schedule of Requirements is attached in Annexure-1 and the same may be read as description in BOQ. | 22 May 2026 | ₹45.64 Lakh |
| 33 | 2026_EICCL_129376_5 · nic | #1 nic | Other Modification in Office Memorandum regarding APS calculation in DTCN. | 22 May 2026 | ₹22.13 Lakh |
| 34 | 2026_EICCL_129376_6 · nic | #1 nic | Other Modification in Office Memorandum regarding APS calculation in DTCN. | 22 May 2026 | ₹35.04 Lakh |
| 35 | 2026_EICCL_129376_3 · nic | #1 nic | Other Modification in Office Memorandum regarding APS calculation in DTCN. | 22 May 2026 | ₹22.13 Lakh |
| 36 | 2026_EICCL_129376_4 · nic | #1 nic | Other Modification in Office Memorandum regarding APS calculation in DTCN. | 22 May 2026 | ₹22.13 Lakh |
| 37 | 2026_EICCL_129376_1 · nic | #1 nic | Other Modification in Office Memorandum regarding APS calculation in DTCN. | 22 May 2026 | ₹9.79 Lakh |
| 38 | 2026_EICCL_129376_2 · nic | #1 nic | Other Modification in Office Memorandum regarding APS calculation in DTCN. | 22 May 2026 | ₹22.13 Lakh |
| 39 | 2026_DSYS_129146_1 · nic | #1 nic | BOQ BOQ Corrigendum 2 | 22 May 2026 | ₹2.5 Cr+ |
| 40 | 2026_FCI_909525_1 · nic | #1 nic | Other The account number mentioned in the MTF NIT p no. 12 has been typographically written incorrectly. The correct BANK AC details are as follows Bank SBI A/c No. 10188393536 IFSC Code SBIN0001141 Kindly deposit the EMD in this BANK AC only. | 22 May 2026 | under ₹1 Cr |
| 41 | 2026_HRD_114332_11 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.11 Cr |
| 42 | 2026_SOLAP_1304333_1 · nic | #1 nic | Other NIT | 22 May 2026 | ₹3.07 Lakh |
| 43 | 2026_SOLAP_1304333_1 · nic | #2 nic | Other Other | 22 May 2026 | ₹3.07 Lakh |
| 44 | 2026_WRDMN_1304523_1 · nic | #1 nic | Other Corrigendum Off E Tender Notice No.02.01 For 2025.26 | 22 May 2026 | ₹1.37 Cr |
| 45 | 2026_BULDH_1304969_1 · nic | #1 nic | Technical Bid e-Tender Notice 01-2026-27 | 22 May 2026 | ₹29.19 Lakh |
| 46 | 2026_BULDH_1304969_2 · nic | #1 nic | Technical Bid e-Tender Notice 01-2026-27 | 22 May 2026 | ₹29.19 Lakh |
| 47 | 2026_PWPIU_509817_1 · nic | #1 nic | Other Construction of New Building at Government Polytechnic College Campus Seoni, Distt.- Seoni (M.P.) (1st Call) | 22 May 2026 | ₹9.72 Cr |
| 48 | 2026_MPHID_507993_1 · nic | #1 nic | Other EMD and Tender Fees Exemption not Allowed | 22 May 2026 | ₹4.92 Lakh |
| 49 | 2026_MPHID_507990_1 · nic | #1 nic | Other EMD and Tender Fees Exemption not Allowed | 22 May 2026 | ₹5.28 Lakh |
| 50 | 2026_EB_676766_1 · nic | #1 nic | Technical Bid Drawing | 22 May 2026 | under ₹1 Cr |
| 51 | 2026_HRY_523364_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹9.74 Lakh |
| 52 | 2026_HRY_523155_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹42.22 Lakh |
| 53 | 2026_HRY_523126_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹14.53 Lakh |
| 54 | 2026_HRY_523134_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹76.56 Lakh |
| 55 | 2026_HRY_522627_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹16.48 Lakh |
| 56 | 2026_HRY_522742_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹1.11 Cr |
| 57 | 2026_HRY_522326_1 · nic | #1 nic | Other The eligibility clause of the DNIT shall be read as under | 22 May 2026 | ₹71,242 |
| 58 | 2026_HRY_522314_1 · nic | #1 nic | Other The eligibility clause of the DNIT shall be read as under | 22 May 2026 | ₹1.19 Lakh |
| 59 | 2026_HRY_523007_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹22.57 Lakh |
| 60 | 2026_HRY_523052_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹37.16 Lakh |
| 61 | 2026_HRY_523116_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹4.72 Lakh |
| 62 | 2026_HRY_522705_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹1.34 Cr |
| 63 | 2026_HRY_522728_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹47.98 Lakh |
| 64 | 2026_HRY_522354_1 · nic | #1 nic | Other The eligibility clause of the DNIT shall be read as under | 22 May 2026 | ₹7.89 Lakh |
| 65 | 2026_HRY_523147_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹31.82 Lakh |
| 66 | 2026_HRY_522673_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹20.96 Lakh |
| 67 | 2026_HRY_522790_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹8.03 Lakh |
| 68 | 2026_HRY_522601_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹27.87 Lakh |
| 69 | 2026_HRY_522762_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹58.90 Lakh |
| 70 | 2026_HRY_522686_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹81.87 Lakh |
| 71 | 2026_HRY_522806_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹9.34 Lakh |
| 72 | 2026_HRY_522784_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹62.01 Lakh |
| 73 | 2026_HRY_523437_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹66.99 Lakh |
| 74 | 2026_HRY_523393_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹79.84 Lakh |
| 75 | 2026_HRY_523029_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹17.80 Lakh |
| 76 | 2026_HRY_522995_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹32.40 Lakh |
| 77 | 2026_HRY_523067_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹3.23 Lakh |
| 78 | 2026_HRY_523063_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹18.60 Lakh |
| 79 | 2026_HRY_523123_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹27.71 Lakh |
| 80 | 2026_HRY_522774_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹56.13 Lakh |
| 81 | 2026_HRY_523621_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹65.57 Lakh |
| 82 | 2026_HRY_522664_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹39.95 Lakh |
| 83 | 2026_HRY_522642_1 · nic | #1 nic | Other Corrigendum for Additional Term and Conditions | 22 May 2026 | ₹9.99 Lakh |
| 84 | 2026_HRY_522345_1 · nic | #1 nic | Other The eligibility clause of the DNIT shall be read as under | 22 May 2026 | ₹1.69 Lakh |
| 85 | 2026_HSD_1024843_20 · nic | #1 nic | Other Correction of EMD amount in NIT | 22 May 2026 | ₹1.35 Lakh |
| 86 | 2026_HSD_1024843_19 · nic | #1 nic | Other Correction of EMD amount in NIT | 22 May 2026 | ₹1.35 Lakh |
| 87 | 2026_HSD_1024843_21 · nic | #1 nic | Other Correction of EMD amount in NIT | 22 May 2026 | ₹3.00 Lakh |
| 88 | 2026_IFC_310564_7 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹4.90 Lakh |
| 89 | 2026_IFC_310564_6 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹15.00 Lakh |
| 90 | 2026_IFC_310564_1 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹10.24 Lakh |
| 91 | 2026_IFC_310493_2 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹10.12 Lakh |
| 92 | 2026_RDPR_310323_1 · nic | #1 nic | Other Please read Providing of 01 light Vehicle i.e Mahindra Scorpio / Bolero Neo along with valid licensed Driver for official Purpose in the office of the Executive Engineer REW Kishtwar instead of Providing of 01 light Vehicle i.e Mahindra Scorpio / Bol | 22 May 2026 | under ₹1 Cr |
| 93 | 2026_IFC_310564_8 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹34.15 Lakh |
| 94 | 2026_IFC_310564_5 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹16.04 Lakh |
| 95 | 2026_IFC_310564_3 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹6.58 Lakh |
| 96 | 2026_IFC_310493_4 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹23.05 Lakh |
| 97 | 2026_IFC_310493_1 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹30.00 Lakh |
| 98 | 2026_HME_310638_1 · nic | #1 nic | Other The Repariment of Machinery and other equipments for Shri Amarnath Ji Yatra 2026 | 22 May 2026 | ₹4.50 Lakh |
| 99 | 2026_POWER_72985_1 · nic | #3 nic | Technical Bid Memorandum | 22 May 2026 | ₹19.45 Lakh |
| 100 | 2026_IFC_310493_5 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹30.10 Lakh |
| 101 | 2026_IFC_310493_5 · nic | #2 nic | Other Change in Name of Work | 22 May 2026 | ₹30.10 Lakh |
| 102 | 2026_IFC_310493_3 · nic | #1 nic | Other Position of AAA | 22 May 2026 | ₹5.54 Lakh |
| 103 | 2026_CEPWD_561915_1 · nic | #1 nic | Other RATE-ANALYSIS-01 | 22 May 2026 | ₹1.32 Cr |
| 104 | 2026_RSWC_556932_22 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 105 | 2026_RSWC_556932_26 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹3.25 Cr |
| 106 | 2026_RSWC_556932_44 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 107 | 2026_RSWC_556932_30 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 108 | 2026_RSWC_556932_46 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 109 | 2026_RSWC_556932_100 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 110 | 2026_RSWC_556932_63 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 111 | 2026_RSWC_556932_69 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 112 | 2026_RSWC_556932_39 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹10.00 Lakh |
| 113 | 2026_RSWC_556932_27 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 114 | 2026_RSWC_556932_6 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 115 | 2026_RSWC_556932_57 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹40.00 Lakh |
| 116 | 2026_RSWC_556932_95 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 117 | 2026_RSWC_556932_32 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹10.00 Lakh |
| 118 | 2026_RSWC_556932_15 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 119 | 2026_RSWC_556932_33 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 120 | 2026_RSWC_556932_21 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 121 | 2026_RSWC_556932_28 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 122 | 2026_RSWC_556932_58 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹40.00 Lakh |
| 123 | 2026_RSWC_556932_45 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 124 | 2026_RSWC_556932_11 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 125 | 2026_RSWC_556932_98 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 126 | 2026_RSWC_556932_103 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹7.00 Cr |
| 127 | 2026_RSWC_556932_68 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 128 | 2026_RSWC_556932_41 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 129 | 2026_RSWC_556932_90 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 130 | 2026_RSWC_556932_31 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.50 Cr |
| 131 | 2026_RSWC_556932_61 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 132 | 2026_RSWC_556932_81 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 133 | 2026_RSWC_556932_85 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 134 | 2026_RSWC_556932_60 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 135 | 2026_RSWC_556932_34 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 136 | 2026_RSWC_556932_106 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 137 | 2026_RSWC_556932_72 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 138 | 2026_RSWC_556932_87 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 139 | 2026_RSWC_556932_88 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 140 | 2026_RSWC_556932_91 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 141 | 2026_RSWC_556932_1 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹30.00 Lakh |
| 142 | 2026_RSWC_556932_29 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 143 | 2026_RSWC_556932_13 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 144 | 2026_RSWC_556932_101 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 145 | 2026_RSWC_556932_64 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹40.00 Lakh |
| 146 | 2026_RSWC_556932_79 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 147 | 2026_RSWC_556932_47 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 148 | 2026_RSWC_556932_19 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 149 | 2026_FORES_561459_1 · nic | #1 nic | Other CORRIGENDUM | 22 May 2026 | ₹29.16 Lakh |
| 150 | 2026_DLB_558142_1 · nic | #2 nic | Technical Bid Corrigendum of Pre bid Meeting | 22 May 2026 | ₹2.33 Cr |
| 151 | 2026_RSWC_556932_24 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 152 | 2026_RSWC_556932_89 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 153 | 2026_RSWC_556932_56 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 154 | 2026_RSWC_556932_73 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 155 | 2026_RSWC_556932_76 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 156 | 2026_RSWC_556932_67 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 157 | 2026_RSWC_556932_38 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 158 | 2026_RSWC_556932_23 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.50 Cr |
| 159 | 2026_RSWC_556932_75 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 160 | 2026_RSWC_556932_14 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 161 | 2026_RSWC_556932_77 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 162 | 2026_RSWC_556932_36 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 163 | 2026_RSWC_556932_25 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 164 | 2026_RSWC_556932_52 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 165 | 2026_RSWC_556932_53 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 166 | 2026_RSWC_556932_7 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 167 | 2026_RSWC_556932_12 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 168 | 2026_RSWC_556932_5 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 169 | 2026_RSWC_556932_62 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 170 | 2026_RSWC_556932_65 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 171 | 2026_RSWC_556932_20 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 172 | 2026_MEDIC_560598_1 · nic | #1 nic | Technical Bid Term and conditions | 22 May 2026 | ₹80.00 Lakh |
| 173 | 2026_RSWC_556932_86 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 174 | 2026_RSWC_556932_8 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 175 | 2026_RSWC_556932_55 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 176 | 2026_RSWC_556932_3 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 177 | 2026_RSWC_556932_18 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 178 | 2026_RSWC_556932_35 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 179 | 2026_RSWC_556932_37 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 180 | 2026_RSWC_556932_70 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 181 | 2026_RSWC_556932_9 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹60.00 Lakh |
| 182 | 2026_RSWC_556932_74 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.50 Cr |
| 183 | 2026_RSWC_556932_17 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 184 | 2026_RSWC_556932_83 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 185 | 2026_RSWC_556932_92 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 186 | 2026_RSWC_556932_96 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 187 | 2026_RSWC_556932_10 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹25.00 Lakh |
| 188 | 2026_RSWC_556932_2 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹60.00 Lakh |
| 189 | 2026_RSWC_556932_4 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 190 | 2026_RSWC_556932_80 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 191 | 2026_RSWC_556932_82 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 192 | 2026_RSRDC_559575_1 · nic | #1 nic | BOQ Revised BOQ | 22 May 2026 | ₹8.99 Cr |
| 193 | 2026_ELECT_560734_1 · nic | #1 nic | Financial Bid Financial Bid corrigendum | 22 May 2026 | ₹24.00 Lakh |
| 194 | 2026_CEPWD_561915_2 · nic | #1 nic | Other RATE-ANALYSIS-02 | 22 May 2026 | ₹1.65 Cr |
| 195 | 2026_RSWC_556932_40 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹15.00 Lakh |
| 196 | 2026_RSWC_556932_71 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 197 | 2026_RSWC_556932_42 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 198 | 2026_RSWC_556932_54 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 199 | 2026_RSWC_556932_94 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹5.00 Cr |
| 200 | 2026_RSWC_556932_59 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹40.00 Lakh |
| 201 | 2026_RSWC_556932_97 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 202 | 2026_RSWC_556932_102 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 203 | 2026_RSWC_556932_16 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.25 Cr |
| 204 | 2026_RSWC_556932_84 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 205 | 2026_RSWC_556932_50 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 206 | 2026_RSWC_556932_43 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 207 | 2026_RSWC_556932_78 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 208 | 2026_RSWC_556932_66 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹40.00 Lakh |
| 209 | 2026_RSWC_556932_105 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹50.00 Lakh |
| 210 | 2026_RSWC_556932_49 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 211 | 2026_RSWC_556932_51 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 212 | 2026_RSWC_556932_93 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.00 Cr |
| 213 | 2026_RSWC_556932_99 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹1.00 Cr |
| 214 | 2026_RSWC_556932_48 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹75.00 Lakh |
| 215 | 2026_RSWC_556932_104 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹2.50 Cr |
| 216 | 2026_WRDAS_558841_1 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | ₹3.84 Cr |
| 217 | 2026_FORES_561469_1 · nic | #1 nic | Other CORRIGENDUM | 22 May 2026 | ₹15.50 Lakh |
| 218 | 2026_WR_168598_1 · nic | #1 nic | Other corri01rr | 22 May 2026 | ₹14.84 Lakh |
| 219 | 2026_WR_168598_1 · nic | #2 nic | Other corri01 | 22 May 2026 | ₹14.84 Lakh |
| 220 | 2026_PWD_290817_3 · nic | #1 nic | Other Change in NIT terms and condition | 22 May 2026 | ₹55,700 |
| 221 | 2026_NTPC_107939_1 · nic | #2 nic | Other Commercial Amendment-01 and Commercial Clarifications-01 | 22 May 2026 | ₹5 Cr+ |
| 222 | 2026_MES_764728_1 · nic | #1 nic | BOQ BOQ REVISED | 22 May 2026 | ₹49.90 Lakh |
| 223 | 2026_MES_764515_1 · nic | #1 nic | BOQ Certain amendment in BOQ | 22 May 2026 | ₹35.00 Lakh |
| 224 | 2026_BRO_766151_1 · nic | #1 nic | BOQ Change in accounting unit in r/o GSB 350mm in Hard Shoulder. BoQ ser No. 1.04 | 22 May 2026 | ₹7.36 Cr |
| 225 | 2026_MES_764345_1 · nic | #1 nic | BOQ revision of BOQ and schedule of credit | 22 May 2026 | ₹4.64 Cr |
| 226 | 2026_MES_766216_1 · nic | #1 nic | Other Amendment in BoQ | 22 May 2026 | ₹35.00 Lakh |
| 227 | 2026_DGDE_765248_1 · nic | #1 nic | Financial Bid Financial Bid Corrigendum | 22 May 2026 | ₹7.37 Lakh |
| 228 | REPAIR MAINTENANCE OF VAVS ALONGWITH CONNECTED ITEMS AT AF STATION ARJAN SINGH UNDER GE AF PANAGARH. 2026_MES_764063_1 · nic | #1 nic | BOQ Corrigendum | 22 May 2026 | ₹10.00 Lakh |
| 229 | 2026_MES_765874_1 · nic | #1 nic | BOQ Revised BOQ | 22 May 2026 | ₹47.01 Lakh |
| 230 | 2026_NHAI_277178_1 · nic | #1 nic | Other RFP and Bidding Excel Sheet | 22 May 2026 | - |
| 231 | 2026_ONGC_276870_1 · nic | #1 nic | Other Modification in NIO conditions | 22 May 2026 | ₹500 Cr+ |
| 232 | 2026_PDD_310369_1 · nic | #1 nic | Other GTP | 22 May 2026 | ₹34.59 Lakh |
| 233 | 2026_AAI_277343_1 · nic | #2 nic | Other Corrigendum for Insurance Surety Bond format | 22 May 2026 | ₹9.16 Cr |
| 234 | 2026_RAJAR_557509_1 · nic | #1 nic | Financial Bid Point no 03 of Corrigendum for Clarification of BOQ for column no 4 | 22 May 2026 | ₹3.25 Cr |
| 235 | 2026_NMRCL_1143036_1 · nic | #1 nic | BOQ Addendum-3 | 22 May 2026 | ₹75.56 Cr |
| 236 | 2026_DVVNL_1148736_1 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | under ₹1 Cr |
| 237 | 2026_DVVNL_1148745_1 · nic | #1 nic | Technical Bid Corrigendum | 22 May 2026 | under ₹1 Cr |
| 238 | 2026_DOLBU_1148095_2 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.16 Cr |
| 239 | 2026_DOLBU_1148095_4 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.14 Cr |
| 240 | 2026_DOLBU_1148095_5 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹57.94 Lakh |
| 241 | 2026_DOLBU_1148095_7 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹2.00 Cr |
| 242 | 2026_DOLBU_1148095_8 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.36 Cr |
| 243 | 2026_DOLBU_1148095_9 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹76.65 Lakh |
| 244 | 2026_DOLBU_1148095_13 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹51.20 Lakh |
| 245 | 2026_DOLBU_1148095_14 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹61.37 Lakh |
| 246 | 2026_DOLBU_1148095_11 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹47.71 Lakh |
| 247 | 2026_DOLBU_1148095_18 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹66.62 Lakh |
| 248 | 2026_DOLBU_1148095_19 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹95.04 Lakh |
| 249 | 2026_DOLBU_1148095_25 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹50.00 Lakh |
| 250 | 2026_DOLBU_1148095_20 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹50.23 Lakh |
| 251 | 2026_DOLBU_1148095_26 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.56 Cr |
| 252 | 2026_DOLBU_1148095_27 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹3.31 Cr |
| 253 | 2026_DOLBU_1148095_24 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹63.44 Lakh |
| 254 | 2026_DOLBU_1148095_28 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹3.31 Cr |
| 255 | 2026_DOLBU_1148095_29 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.19 Cr |
| 256 | 2026_DOLBU_1148095_30 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹82.31 Lakh |
| 257 | 2026_DOLBU_1148095_31 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.50 Cr |
| 258 | 2026_DOLBU_1148095_32 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.11 Cr |
| 259 | 2026_DOLBU_1148095_35 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.69 Cr |
| 260 | 2026_DOLBU_1148095_37 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.11 Cr |
| 261 | 2026_DOLBU_1148095_44 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹53.33 Lakh |
| 262 | 2026_DOLBU_1148095_40 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹75.16 Lakh |
| 263 | 2026_DOLBU_1148095_41 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.35 Cr |
| 264 | Road construction work by CC from Jaleshwar Road Om Sai Ram Transport to Municipal Corporation land. 2026_DOLBU_1148095_42 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹96.78 Lakh |
| 265 | 2026_DOLBU_1148095_48 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹77.82 Lakh |
| 266 | 2026_DOLBU_1148095_49 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹55.33 Lakh |
| 267 | 2026_DOLBU_1148095_51 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.06 Cr |
| 268 | 2026_DOLBU_1148095_58 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹68.04 Lakh |
| 269 | 2026_DOLBU_1148095_59 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹78.04 Lakh |
| 270 | 2026_DOLBU_1148095_60 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹68.24 Lakh |
| 271 | 2026_DOLBU_1148095_61 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.20 Cr |
| 272 | 2026_DOLBU_1148095_62 · nic | #1 nic | Other Corrigendum of EMD Amount | 22 May 2026 | ₹1.50 Cr |
| 273 | 2026_SCIDC_1146422_2 · nic | #1 nic | Technical Bid Attached | 22 May 2026 | under ₹1 Cr |
| 274 | 2026_SCIDC_1146430_2 · nic | #1 nic | Technical Bid Attached | 22 May 2026 | under ₹1 Cr |
| 275 | 2026_SCIDC_1144190_2 · nic | #1 nic | Technical Bid Attached | 22 May 2026 | under ₹1 Cr |
| 276 | 2026_SCIDC_1146493_2 · nic | #1 nic | Technical Bid Attached | 22 May 2026 | under ₹1 Cr |
| 277 | 2026_SCIDC_1146426_2 · nic | #1 nic | Technical Bid Attached | 22 May 2026 | under ₹1 Cr |
| 278 | 2026_UPSBC_1150692_1 · nic | #1 nic | Other WORK NAME CHANGE | 22 May 2026 | ₹11.40 Cr |
| 279 | 2026_UPSBC_1150647_1 · nic | #1 nic | Other WORK NAME CHANGE | 22 May 2026 | ₹11.40 Cr |
| 280 | 2026_UPSBC_1150676_1 · nic | #1 nic | Other WORK NAME CHANGE | 22 May 2026 | ₹11.40 Cr |
| 281 | 2026_UPCDS_1148227_1 · nic | #1 nic | Other Revisied New BOQ | 22 May 2026 | ₹14.38 Lakh |
| 282 | 2026_UPCDS_1148227_1 · nic | #2 nic | Other REVISED BOQ FILE | 22 May 2026 | ₹14.38 Lakh |
| 283 | 2026_UPCDS_1144336_1 · nic | #1 nic | Technical Bid Bid Documents | 22 May 2026 | ₹34.77 Cr |
| 284 | 2026_DOLBU_1142777_1 · nic | #1 nic | Other CORRECTION OF BANK IFSC CODE-BARB0BUPGBX | 22 May 2026 | under ₹1 Cr |
| 285 | 2026_REDUP_1148890_1 · nic | #1 nic | Other Corrigendum | 22 May 2026 | ₹57.54 Lakh |
| 286 | 2026_IFC_310307_2 · nic | #1 nic | Other Corrigendum | 22 May 2026 | ₹25.72 Lakh |
| 287 | 2026_IFC_310307_4 · nic | #1 nic | Other Corrigendum | 22 May 2026 | ₹25.68 Lakh |
| 288 | 2026_IFC_310307_1 · nic | #1 nic | Other Corrigendum | 22 May 2026 | ₹14.80 Lakh |
| 289 | 2026_KCMMF_852125_1 · nic | #1 nic | Technical Bid There are certain changes in the number of employees | 22 May 2026 | ₹50.00 Lakh |
| 290 | 2026_KCMMF_852123_1 · nic | #1 nic | Technical Bid There are certain changes in the numbers of the employees | 22 May 2026 | ₹2.00 Cr |
| 291 | 2026_PWBNH_52433_1 · nic | #1 nic | BOQ BOQ Correction | 22 May 2026 | ₹9.11 Cr |
| 292 | 2026_NMRCL_1148041_1 · nic | #1 nic | BOQ BOQ | 22 May 2026 | ₹1267.00 Cr |
| 293 | 2026_UPTCL_1151938_1 · nic | #1 nic | Technical Bid NIT REVISED | 22 May 2026 | ₹2.00 Lakh |
| 294 | 2026_MES_760563_1 · nic | #2 nic | BOQ AMENDMENT TO TENDER DOCUMENTS AND REVISED BOQ | 22 May 2026 | ₹4.31 Cr |
| 295 | 2026_HFW_1024598_1 · nic | #1 nic | Terms and Conditions Cancellation of Tender | 22 May 2026 | under ₹1 Cr |
| 296 | 2026_KSRRD_147780_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹6.30 Cr |
| 297 | 2026_KSRRD_147777_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹3.78 Cr |
| 298 | 2026_KSRRD_147774_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹3.48 Cr |
| 299 | 2026_KSRRD_147779_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹3.51 Cr |
| 300 | 2026_KSRRD_147776_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹3.28 Cr |
| 301 | 2026_KSRRD_147773_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹4.34 Cr |
| 302 | 2026_KSRRD_147778_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹4.84 Cr |
| 303 | 2026_KSRRD_147775_1 · nic | #1 nic | Other Corrigendum NIT 05 | 22 May 2026 | ₹4.63 Cr |
| 304 | 2026_IDCO_129614_1 · nic | #1 nic | BOQ REVISED BOQ | 22 May 2026 | ₹44.16 Lakh |