Similar live tenders
Estimate for Construction of Boulder Stone Revetment with Wire crates to save Road and adj₹10.31 Lakhcloses 19 Jun 2026REPAIR AND RENOVATION OF DHARAMSHALLA AT GANDHI NAGAR NAUDHRANI ROAD W.NO. 13₹10.17 Lakhcloses 26 Jun 2026Const. of WBM road near haweli enclave ward no. 17₹11.24 Lakhcloses 22 Jun 2026Supply and Laying Premix Patchwork in Different Roads at Dhuri City.₹9.94 Lakhcloses 19 Jun 2026P/L interlocking tiles and Road gully exchange to Baljinderpal,AvtarSingh,Balbir Singh to ₹11.40 Lakhcloses 17 Jun 2026Const. of WBM Road Sai Nagar Part-1₹9.78 Lakhcloses 22 Jun 2026Const. of WBM ROAD sant enclave ward no. 17₹9.78 Lakhcloses 22 Jun 2026New Construction of Link Road Mehma Sarja Main Road to Sardar Harphool Singh Brar de Ghar ₹9.78 Lakhcloses 19 Jun 2026Estimate for Construction of Boulder Stone Revetment with Wire crates to save Road and adj₹10.31 Lakhcloses 19 Jun 2026REPAIR AND RENOVATION OF DHARAMSHALLA AT GANDHI NAGAR NAUDHRANI ROAD W.NO. 13₹10.17 Lakhcloses 26 Jun 2026Const. of WBM road near haweli enclave ward no. 17₹11.24 Lakhcloses 22 Jun 2026Supply and Laying Premix Patchwork in Different Roads at Dhuri City.₹9.94 Lakhcloses 19 Jun 2026P/L interlocking tiles and Road gully exchange to Baljinderpal,AvtarSingh,Balbir Singh to ₹11.40 Lakhcloses 17 Jun 2026Const. of WBM Road Sai Nagar Part-1₹9.78 Lakhcloses 22 Jun 2026Const. of WBM ROAD sant enclave ward no. 17₹9.78 Lakhcloses 22 Jun 2026New Construction of Link Road Mehma Sarja Main Road to Sardar Harphool Singh Brar de Ghar ₹9.78 Lakhcloses 19 Jun 2026
HomeRoads & HighwaysRupnagar2026_POWER_170037_1
Power & EnergyRoads & HighwaysSupply / ProcureOther

Procurement of Position Feed Back Transmitter, EPT-002 or equivalent for Pneumatic Power Cylinders and control valves of Stage- II,III and HP Bypass system, GGSSTP, Rupnagar

Department of Power » Punjab State Power Corporation Limited » GGSSTP, Roopnagar » P-2 · Ref 7818/P-2/EMP-13350 Dated 11.06.26
Tender value
₹10.63 Lderived from EMD
Closes
22 Jun 2026
6 days left
EMD
₹21 Kexemption allowed
Status
Closing soon

📄Overview

Department of Power has invited open tender bids for "Procurement of Position Feed Back Transmitter, EPT-002 or equivalent for Pneumatic Power Cylinders and control valves of Stage- II,III and HP Bypass system, GGSSTP, Rupnagar" at Rupnagar, Punjab — a Roads & Highways other on a Tender cum Auction basis, carrying an estimated value of about ₹10.63 L (derived from the EMD, as the department didn't publish it). Bids close on 22 June 2026. EMD is ₹21 K. Reference 7818/P-2/EMP-13350 Dated 11.06.26.

🗓️Timeline

Published
12 Jun 2026
Submission opens
12 Jun 2026
Submission closes
22 Jun 2026
Bid opening
24 Jun 2026

📎Tender documents

Documents are mirrored from the source portal for reference. Live bidding and authoritative documents remain on the official portal.

📋Complete tender details

🏷️ Identification
Tender ID2026_POWER_170037_1
Reference No.7818/P-2/EMP-13350 Dated 11.06.26
OrganisationDepartment of Power » Punjab State Power Corporation Limited » GGSSTP, Roopnagar » P-2
Product categoryMiscellaneous Goods
💰 Commercials
Estimated value₹10.63 L
Form of contractTender cum Auction
EMD₹21,250
EMD exemptionAllowed
Tender feeNil
Payment modeOnline
⚖️ Process & eligibility
Tender typeOpen Tender
CategoryOther
No. of covers3
Bid validity120 days
Two-stage biddingNo
Withdrawal allowedYes
📍 Location & authority
LocationRupnagar, Punjab
PIN140113
Bid opening placeggsstp
Inviting authorityDyCE/HQ

Frequently asked questions

What is this tender for?
Department of Power floated this tender for "Procurement of Position Feed Back Transmitter, EPT-002 or equivalent for Pneumatic Power Cylinders and control valves of Stage- II,III and HP Bypass system, GGSSTP, Rupnagar" — Roads & Highways work, procured as a other contract on a Tender cum Auction basis.
What is the estimated value?
The value was not disclosed; based on the EMD it works out to about ₹10.63 L.
What are the EMD and tender fee?
EMD is ₹21 K; tender fee is nil.
When do bids close?
Bids close on 22 June 2026; bids open on 24 June 2026.