HomeDepartmentsWater & SanitationPunjab

Water & Sanitation Tenders in Punjab 2026

Live Water & Sanitation tenders in Punjab — 876 open right now, ranked by estimated value. Mirrored daily from the official e-procurement portals, free and without login.

Live tenders
876
Mitigation of flood risk in River Beas by extension of Motla and Mehtabpur bandh along left edge of River Beas in Tehsil Mukerian, Distt. Hoshiarpur
Closes 22 Jun 2026NIC Punjab
₹21.16 Cr
PROVIDING SEWERAGE SCHEME IN VILLAGE TIBBER COMPLETE IN ALL RESPECT ON DBOT BASIS BLOCK AND DISTRICT GURDASPUR INCLUDING O and M FOR 5 YEARS. (Under Head 4215)
Closes 17 Jun 2026NIC Punjab
₹20.26 Cr
Supply, Installation, Commissioning, and 5Year Operation and Maintenance of 200 HP Pump Sets, Vacuum Pumps, Valves, Pipes, and Electrical Panels for Lifting Water from Sirhind Canal RD 145700R into Neelon Drain
Closes 16 Jun 2026NIC Punjab
₹15.90 Cr
Aug. and Rehabilitation of Water Supply System by Providing Tap Connections, Distribution Network, Construction of clear water reservoir including Electro-Mechanical works complete in all respect at Faridkot Town District Faridkot (AMRUT 2.0)
Closes 17 Jun 2026NIC Punjab
₹13.30 Cr
Carrying/lifting of River Bed Material already extracted from Power House 2 and stocked at stockyard of department near Power House 2 of Shahpurkandi Dam Project at Village Sadhauri, Tehsil and District Pathankot
Closes 22 Jun 2026NIC Punjab
₹8.74 Cr
River erosion mitigation measure by Repair ,Restoration and bringing to design section Spur at RD 2000 along with repair and restoration of revetment and T-studs on U/S of Spur RD 2000 in Chaharpur complex.
Closes 19 Jun 2026NIC Punjab
₹7.36 Cr
Work of Revetment damaged series of Revetment Studs to save nearby abadies agricultural land of village Burj in river Sutlej under the Jurisdiction of Drianage division
Closes 16 Jun 2026NIC Punjab
₹6.98 Cr
River erosion mitigation by Repair of Spur Apron along with Stud and shank portion at RD 88200 of main FPE on left Side of River Ravi
Closes 19 Jun 2026NIC Punjab
₹5.67 Cr
Desilting of River Sutlej in village Gorsian Khan Mohammad to protect nearby abadies and agricultural land
Closes 16 Jun 2026NIC Punjab
₹5.00 Cr (calculated)
Desilting of River Sutlej in between RD 1600-4700 and RD 10500-11760 of 4L Bandh of Seed Farm Complex to Protect nearby area of left side of River Sutlej in village Goindwal and Allowal in Distt. Ludhiana
Closes 16 Jun 2026NIC Punjab
₹5.00 Cr (calculated)
Desilting of River Sutlej in between RD 38730-40980 of 4L Bandh of Khaira bet Complex to Protect nearby area of left side of River Sutlej in Distt. Ludhiana
Closes 16 Jun 2026NIC Punjab
₹5.00 Cr (calculated)
Desilting in Longitudinal Length opposite Shergarh and Dhulewal Complex RD 55000-70000 of 3L Bandh to guide the Flow of River Sutlej
Closes 16 Jun 2026NIC Punjab
₹5.00 Cr (calculated)
Desilting of Hussainiwala Barrage to restore its original capacity
Closes 17 Jun 2026NIC Punjab
₹5.00 Cr (calculated)
Estimate for Construction of Malerkotla Minor from RD 8400 to 20200
Closes 16 Jun 2026NIC Punjab
₹4.90 Cr
Estimate for Construction of Malerkotla Minor from RD 25100 to 36600
Closes 16 Jun 2026NIC Punjab
₹4.80 Cr
River erosion mitigation measure by repairing no 1 reclamation spur opposite border fencing between gate no 53 and 55 near BOP Dharamparkash on left side of river ravi
Closes 19 Jun 2026NIC Punjab
₹4.68 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 31000 to 36000 main line in service bank along of kairon Drain at RD 76700/R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.52 Cr
Relining of Ferozepur Feeder from RD 114500-117000
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Relining of FerozepurFeeder from RD 117000-119198
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Relining of Ferozepur Feeder from RD 107184-109500
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Relining of Ferozepur Feeder from RD 112000-114500
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Relining of FerozepurFeeder from RD 109500-112000
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Relining of FerozepurFeeder from RD 104500-107184
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Relining of Ferozepur Feeder from RD 102154-104500
Closes 22 Jun 2026NIC Punjab
₹4.50 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 26500 to 31000 main line in service bank along of kairon Drain at RD 76700/R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.45 Cr
Estimate for Construction of Malerkotla Minor from RD 47000 to 61900
Closes 16 Jun 2026NIC Punjab
₹4.40 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 18000 to 22300 main line in service bank along of kairon Drain at RD 76700 R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.35 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 41500 to 47400 main line in service bank along of kairon Drain at RD 76700 R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.32 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 36000 to 41500 main line in service bank along of kairon Drain at RD 76700/R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.31 Cr
Estimate for construction of Udekaran Disty from RD 51940 to 85140
Closes 17 Jun 2026NIC Punjab
₹4.30 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 22300 to 26500 main line in service bank along of kairon Drain at RD 76700 R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.26 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 47400 to 53930 main line in service bank along of kairon Drain at RD 76700 R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.24 Cr
CONSTRUCTION OF 75 CUM RCC OHSR 2 No. Repair of old OHSR 75 and 200 cum CONSTRUCTION OF 1 NO. NEW PUMP CHAMBER 6.10 M X 4.88 M 2 NO. REPAIR OF OLD PUMP CHAMBER 6.10M X 4.88M DISTRIBUTION SYSTEM SITE LAYING CARRIAGE OF MATERIALS
Closes 16 Jun 2026NIC Punjab
₹4.18 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 14100 to 18000 main line in service bank along of kairon Drain at RD 76700 R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹4.16 Cr
Estimate for Construction of Malerkotla Minor from RD 36600 to 47000
Closes 16 Jun 2026NIC Punjab
₹4.00 Cr
Estimate for Construction of Malerkotla Minor from RD 0 to 8400
Closes 16 Jun 2026NIC Punjab
₹4.00 Cr
Relining of Ferozepur Feeder from RD 121000-123000
Closes 22 Jun 2026NIC Punjab
₹4.00 Cr
Estimate for Construction of 1L Minor of Malerkotla Minor from RD 0 to 10000
Closes 16 Jun 2026NIC Punjab
₹4.00 Cr
Relining of Ferozepur Feeder from RD 119198-121000
Closes 22 Jun 2026NIC Punjab
₹4.00 Cr
AUGMENTATION OF EXISTING WATER SUPPLY SCHEME GOLEWALA BLOCK AND DISTT. FARIDKOT
Closes 22 Jun 2026NIC Punjab
₹3.99 Cr
Construction of Pump House and Control Room, Construction of Sump Well, Lining of Sirhind Canal and Neelon Drain, Construction of Protection Works at Outfall of Riser Main, and Joining of NP3 700 mm Dia Pipe with Sump Well for Construction of Surface
Closes 16 Jun 2026NIC Punjab
₹3.81 Cr
REPAIR/RENOVATION OF PUBLIC HEALTH SERVICES, RAIN WATER HARVESTING, FIRE FIGHTING, AIR CONDITIONING SYSTEM AT OLYMPIAN BALBIR SINGH SENIOR INTERNATIONAL HOCKEY STADIUM AT SECTOR-63, S.A.S. NAGAR.
Closes 15 Jun 2026NIC Punjab
₹3.79 Cr
Estimate for laying pipeline for Gajjanmajra distributary pipeline RD 53930 to 63000 main line in service bank along of kairon Drain at RD 76700 R of First Patiala Feeder
Closes 17 Jun 2026NIC Punjab
₹3.75 Cr
River erosion mitigation measure by Repair , restoration and bringing to design section of studs and revetment in between RD 14800 to 15800 of earthen bundh in BOP shahpur chaharpur complex on Left side of Ravi River
Closes 19 Jun 2026NIC Punjab
₹3.58 Cr
Estimate for construction of Udekaran Disty from RD 0-17565
Closes 17 Jun 2026NIC Punjab
₹3.50 Cr
Flood risk mitigation by raising and strengthening of left marginal bundh of river Ghaggar from RD 23500 to 29500 in constituency Ghanaur to save nearby road, village and agricultural land during flood season 2026 TO 27 district Patiala Punjab
Closes 16 Jun 2026NIC Punjab
₹3.28 Cr
Estimate for Flood Risk Mitigation by Laying RCC pipeline in low lying area of Village Lohara out falling at RD 117420 of Chandbhan Diversion Drain.
Closes 22 Jun 2026NIC Punjab
₹3.27 Cr (calculated)
Flood Risk Mitigation by Construction of Revetment Studs on left side of Swan River near Bhallri Shmashanghat to save nearby abadies agricultural land of Village Bhallri
Closes 16 Jun 2026NIC Punjab
₹3.26 Cr
Desilting in longitudinal length opp. Bholewal complex RD 5500-19000/2R Bandh to guide the flow of River Sutlej.
Closes 16 Jun 2026NIC Punjab
₹3.23 Cr
CONSTRUCTION OF 100 CUM RCC OHSR 3 No. Repair of Old OHSR 90 200 and 300 cum CONSTRUCTION OF 2 NO. NEW PUMP CHAMBER 6.10 M X 4.88 M 1 NO. REPAIR OF OLD PUMP CHAMBER 6.10M X 4.88M DISTRIBUTION SYSTEM SITE LAYING CARRIAGE OF MATERIALS
Closes 16 Jun 2026NIC Punjab
₹3.08 Cr
See all 876 on live search →