HomeDepartmentsRoads & HighwaysDelhi

Roads & Highways Tenders in Delhi 2026

Live Roads & Highways tenders in Delhi — 422 open right now, ranked by estimated value. Mirrored daily from the official e-procurement portals, free and without login.

Live tenders
422
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
Closes 8 Jul 2026CPSE
₹9030.38 Cr
CONSTRUCTION OF 4 LANE THIRUVANANTHAPURAM OUTER RING ROAD (ORR) FROM NAVAIKULAM (CH. 0.000) TO VIZHINJAM (CH. 62.700) SECTION OF NH 866 DESIGN LENGTH 62.7 KM IN KERALA ON BOT MODE
Closes 6 Aug 2026CPSE
₹8004.72 Cr
Develop of 6L access controlled greenfield highway starting from Junction with NH60 at Adgaon km. 138.00 to Ahilyanagar km. 290.000 (Ahilyanagar Bypass pkg I)
Closes 8 Jul 2026CPSE
₹7596.33 Cr
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
Closes 24 Jun 2026CPSE
₹5757.23 Cr
Widening and Improvement of existing carriageway to 4lanes of Kaliabor-Numaligarh (Km.315.315-Km.400.990) of NH37 (New NH715) including Implementation of Wildlife-friendly Measures Proposed on Kaziranga National Park (KNP) in Assam on EPC (2nd call)
Closes 9 Jul 2026CPSE
₹4829.14 Cr
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Closes 7 Jul 2026CPSE
₹4135.60 Cr
Develop. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Pragnapur Vill Design Ch82.000 to Tangad Palle Vill Design Ch160.000 for a Design L of 78.000 Km in the State of Telangana under NH(O) on HAM PKGII
Closes 7 Jul 2026CPSE
₹3727.32 Cr
Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)
Closes 1 Jul 2026CPSE
₹3653.09 Cr
Develop of 4L Badvel to Nellore Highway from Badvel Gopavaram Vill on NH67 Ch.630.960 to Guruvindapudi Vill on NH-16 Ch.739.094 in Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a total length of 108.134 km
Closes 6 Jul 2026CPSE
₹3352.83 Cr
Construction of new 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I).
Closes 24 Jun 2026CPSE
₹3320.89 Cr
Const. of STRR(West side) NH948A Kunigal (Ramanagara Taluk) to S Mudugadapalli (Hosur Taluk) from Km 79 to km 144.25 144.00 DC PhaseII in Karnataka on HAM (PL 65.25 kms)
Closes 22 Jun 2026CPSE
₹2779.17 Cr
Const. of STRR (West side) NH948A Obalapura (Nelamangala Taluk))to Kunigal(Ramanagara Taluk) from Km 0 to km 79 DC PhaseI in Karnataka on HAM (PL79 kms)
Closes 22 Jun 2026CPSE
₹2642.40 Cr
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Closes 30 Jun 2026CPSE
₹2441.07 Cr
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
Closes 2 Jul 2026CPSE
₹2271.73 Cr
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II
Closes 21 Aug 2026CPSE
₹2176.23 Cr
4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode.
Closes 24 Jun 2026CPSE
₹1979.11 Cr
Upgradation of Existing Four Lane Carriageway to Six Lane from Ch 0.000 (Existing km 0.000) (Kandla) in Gandhidham to Ch 71.350 (Existing km 71.400) (Mundra) near Moti Khakhar (Length 71.350 km) section of NH 41 in Gujarat under Hybrid Annuity Mode
Closes 30 Jun 2026CPSE
₹1917.28 Cr
Construction of 4lane GF Amritsar-Katra connectivity of Amritsar with DAK Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction NH3 and Taran Taran Bypass near Mannawalla village ch.70.950 (Km 40.900-Km 70.950 Pkg-2) on EPC Mode in Punjab
Closes 29 Jun 2026CPSE
₹1751.83 Cr
Construction of new 2-lane with paved shoulder coastal Highway from Konark to Paradeep (Km.79.400 to Km. 160.180) on Hybrid Annuity Mode in the state of Odisha (Package-II).
Closes 24 Jun 2026CPSE
₹1640.71 Cr
Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM
Closes 17 Jun 2026CPSE
₹1623.51 Cr
4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)
Closes 24 Jun 2026CPSE
₹1573.00 Cr
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Closes 25 Jun 2026CPSE
₹1462.19 Cr
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH52 from km 18.000 Khandwa to km 27.000 Ahilyapur from 4to6L PKG2 of Indore in MP on HAM
Closes 2 Jul 2026CPSE
₹1345.65 Cr
BW for Cons.of 4lane Greenfield DAKE from Jun. with Jalandhar Kapurthala road (NH703A) near Khojewal village to Junction with Amritsar Mehta Sri Hargobindpur Tanda road (NH503A) (Km 319.400 to 362.420) on EPC mode under NH(O) in Punjab (PKG-11)
Closes 8 Jul 2026CPSE
₹1273.99 Cr
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
Closes 25 Jun 2026CPSE
₹1259.53 Cr
Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO
Closes 17 Jun 2026CPSE
₹1237.07 Cr
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Closes 6 Jul 2026CPSE
₹1182.25 Cr
Balance works for Cons. of 4-lane Greenfield Delhi Amritsar Katra Exp. from Jun. with Ludhiana Malerkotla Road (SH11) near Bhogiwal village to Junction with Ludhiana Moga Road (NH5) (Km 225.770 to km 260.860)on EPC mode under NH(O) in Punjab (PKG-08)
Closes 8 Jul 2026CPSE
₹1110.23 Cr
Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt
Closes 25 Jun 2026CPSE
₹991.61 Cr
Four laning of Jhunjhunu Chirawa Pacheri Section from design km 0.000 to km 66.700 of NH11 including Chirawa Northern Bypass from design km 0.000(Junction with NH11 at km 33.900)to km 10.260(junction with SH13)in the State of Rajasthan on HAM Mode
Closes 16 Jun 2026CPP eProcure
₹883.21 Cr
2 Lane with Paved Shoulder/4 Laning of Damoh Jabalpur Section of NH 34 (PKG I and III) in Madhya Pradesh From Damoh (Design Ch. 4.050km) to Jabera (Design Ch. 43.500) and From Katangi (Design Ch. 66.800km) to Jabalpur (Design Ch. 86.302) on HAM
Closes 18 Jun 2026CPSE
₹882.56 Cr
Balance Work for Construction of 8-lane access-controlled Expressway from Km 128.0 to Km 154.6 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in Gujarat on EPC mode (Pkg-IX)
Closes 14 Jul 2026CPSE
₹873.62 Cr
Const. of 4lane elevated corridor including approaches from Old Pune Naka to Boramani Naka on NH65 in Solapur City on HAM in Maharashtra (Km 0.050 to Km 9.710)
Closes 1 Jul 2026CPSE
₹821.05 Cr
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode
Closes 29 Jun 2026CPP eProcure
₹763.72 Cr
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be executed on Hybrid Annuity Mode under NH O
Closes 16 Jul 2026CPSE
₹758.75 Cr
Upgradation to Two lane with paved shoulder of Porbandar Bhanvad Jamjodhpur Kalavad section of NH-151K from Design km 0.000 to Design km 119.500 in the State of Gujarat on HAM.
Closes 30 Jun 2026CPP eProcure
₹749.39 Cr
Tolling Operation Maintenance and Transfer of Muzzafarpur- Darbanga- Asanpur section of NH-27 in the state of Bihar (TOT Bundle-20)
Closes 23 Jul 2026CPSE
₹730.00 Cr (calculated)
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
Closes 14 Jul 2026CPSE
₹707.38 Cr
Tolling Operation Maintenance and Transfer of Asanpur- Forbesganj- Purnea section of NH-27 in the state of Bihar (TOT Bundle-21)
Closes 23 Jul 2026CPSE
₹700.00 Cr (calculated)
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Closes 8 Jul 2026CPSE
₹669.12 Cr
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Closes 6 Jul 2026CPSE
₹643.74 Cr
Up-gradation of the missing link of the Amritsar-Jamnagar Economic Corridor between Maliya and Pipaliya section of NH-151A (Length 24.611 km) in the State of Gujarat on HAM
Closes 29 Jun 2026CPSE
₹634.61 Cr
Widening of existing two lane to four lane of Suratgarh-Sri Ganganagar section from Km. 175.000 to Km. 250.900 of NH-62 in the State of Rajasthan on EPC mode.
Closes 22 Jun 2026CPP eProcure
₹633.99 Cr
Upgradation to Four lane with paved shoulder of Kalavad-Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat on Hybrid Annuity Mode.
Closes 15 Jul 2026CPP eProcure
₹601.43 Cr
Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode
Closes 30 Jun 2026CPP eProcure
₹563.40 Cr
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Closes 16 Jun 2026CPSE
₹556.46 Cr
Upgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.
Closes 29 Jun 2026CPP eProcure
₹522.71 Cr
Engagement of user fee agency on the basis of EQ through etender for Shahjahanpur fee plaza in the State of Haryana and Rajasthan and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Closes 15 Jun 2026CPSE
₹511.28 Cr
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.
Closes 27 Jul 2026CPP eProcure
₹497.58 Cr
Upgradation to 4 lanes with Paved shoulders from design km 0.850 to km 50.246 of Mahwa Mandawar Rajgarh section of NH-921 and Construction of flyover from design km 0.000 to 1.700 of NH-21 (near junction with NH 921) in the State of Rajasthan.
Closes 23 Jun 2026CPP eProcure
₹481.35 Cr
See all 422 on live search →