The work scope is captured in the title above. Detailed scope, drawings and specifications are in the NIT document — download from the Documents tab.
Product Category: Electrical Works
Work related to replacement of 11 kV VCB and repair, strengthening and protection of 33 kV VCB at various 33/11 kV power substations in the Business Plan 2026-27 under Electricity Distribution Section-Sikandrabad