Bids close in 9d 14h · 12 June 2026
2026_BCCL_360619_1 Bid Open · Ref GM/B-II/AM (ENM)/E-TENDER/2026-27/046 dt 02/06/26 · NIC eProcure / GePNIC

Work Breakdown repairing 11KV F/No near coal dump Jocp damaged by OB bolder power supply Jocp Matigarh, Bhimkanali (B) Breakdown repairing of 440V LT O/H line near Jocp coal dump damage by OB bolder power supply Jocp Attendance room Kali Mandir light

Dhanbad, Jharkhand PIN 828306 Published 2 June 2026
Civic / Administration / OtherPower / ElectricalMaintenance / O&MWorksElectrical and Maintenance WorksWithdrawal allowed0 corrigenda
Auto-classified · Sector “Power / Electrical” matched “11KV” · Work “Maintenance / O&M” matched “repair”
↗ Official Portal ⤓ All as ZIP 🔔 f
BidEasy Intelligently

Bharat Coking Coal Limited has invited open tender tender bids for the work “Work Breakdown repairing 11KV F/No near coal dump Jocp damaged by OB bolder power supply Jocp Matigarh, Bhimkanali (B) Breakdown repairing of 440V LT O/H line near Jocp coal dump damage by OB bolder power supply Jocp Attendance room Kali Mandir light” at Dhanbad, Jharkhand, PIN 828306. It is classified as Power / Electrical work, Maintenance / O&M in nature, procured as a works contract, carrying an estimated value of ₹97,957. Bids close on 12 June 2026; bids open on 13 June 2026. The earnest money deposit (EMD) is ₹1,300, and no tender fee is specified. The tender reference is GM/B-II/AM (ENM)/E-TENDER/2026-27/046 dt 02/06/26.

Tender Value₹97,957
EMD₹1,300
Tender feenot available
Perf. security5%
Published
2 Jun
Pre-bid
not available
Bid opening
13 Jun · 11:00
Completion
+ 7 days
NIT — read first
Work-item documents
Corrigendums
No corrigenda issued for this tender so far. Last checked 2 June 2026. Any addendum or deadline extension will appear here.

The work scope is captured in the title above. Detailed scope, drawings and specifications are in the NIT document — download from the Documents tab.

Product Category: Electrical and Maintenance Works

Pre-qualification criteria are listed in the NIT document. Typical fields include turnover, similar-work experience, contractor class and net worth. Download the NIT from the Documents tab.

Similar tenders

Frequently asked questions

What is this tender for?
Bharat Coking Coal Limited has floated this tender for “Work Breakdown repairing 11KV F/No near coal dump Jocp damaged by OB bolder power supply Jocp Matigarh, Bhimkanali (B) Breakdown repairing of 440V LT O/H line near Jocp coal dump damage by OB bolder power supply Jocp Attendance room Kali Mandir light”. It is Power / Electrical work, Maintenance / O&M in nature, procured as a works contract.
What is the estimated value of this tender?
The estimated tender value is ₹97,957.
When is the last date to submit bids?
Bids close on 12 June 2026. Bid opening is on 13 June 2026.
Which department issued this tender and where is the work?
It was issued by Bharat Coking Coal Limited. The work location is Dhanbad, Jharkhand, PIN 828306.
What are the EMD and tender fee?
EMD is ₹1,300; the tender fee is nil.
How do I download the tender documents and BoQ?
Open the ‘Documents’ section above to download the NIT, BoQ and any corrigenda for reference GM/B-II/AM (ENM)/E-TENDER/2026-27/046 dt 02/06/26. Bidding is done on the NIC eProcure portal.