The work scope is captured in the title above. Detailed scope, drawings and specifications are in the NIT document — download from the Documents tab.
Product Category: Solid Waste Management
Regarding Door to door Collection Segregation of MSW from each establishment and Transportation to the Processing site in MC Barara for 05 years