EP-30/CGM (E)/K bad Zone-VIII/600 mm dia MS Pipe Line / 2026-27, Dt:14.05.2026
Pre-qualification criteria are listed in the NIT document. Typical fields include turnover, similar-work experience, contractor class and net worth. Download the NIT from the Documents tab.