50/26-27/CE/O&M/KTPP/EM-II/Supply of Spares for Hydrogen gas Drier (Make: Span) of 600MW Turbo Generator
Pre-qualification criteria are listed in the NIT document. Typical fields include turnover, similar-work experience, contractor class and net worth. Download the NIT from the Documents tab.